What you need to know before scheduling
Most building departments require an appointment to submit permit applications in person, though some accept mail or online submission without one. Whether you need an appointment depends on your local jurisdiction and the type of permit — a small electrical repair might be handled by mail, while a foundation alteration usually requires a face-to-face review. Call your city or county building department directly to ask whether your project needs an appointment and whether they're currently accepting new ones, since many departments have backlogs and stop scheduling weeks or months ahead.
The appointment itself is typically 15 to 30 minutes. You'll bring your completed application, site plans, and any supporting documents the department listed. The permit examiner will review your paperwork on the spot, ask clarifying questions, and either approve it for processing or tell you what's missing. They won't issue the permit that day — that comes after plan review, which takes weeks to months depending on complexity and current workload.
Key Takeaways
- Contact your building department by phone to confirm whether your project requires an appointment and whether they're currently scheduling new ones.
- Bring all required documents to your appointment, including a completed application form, site plans, and proof of property ownership or authorization.
- The appointment is for submission and initial review only; the actual permit is issued after the department completes its plan review, which can take several weeks.
- Many departments have scheduling delays during busy seasons, so call early and ask about current wait times before planning your project timeline.
How to find your local building department's scheduling system
Start by searching "[your city or county] building department" plus "permit appointment" or "schedule appointment." Most departments post their scheduling link on their website, often under a "Permits" or "Services" tab. Some use online booking systems where you select a date and time; others require you to call during business hours. A few still use email or walk-in-only systems with no advance scheduling.
If you can't find the scheduling information online, call the main building department number and ask for the permit counter or applications desk. Have your project type ready — "residential addition," "electrical work," "foundation repair" — because some departments route different permit types to different schedulers or require different lead times. Ask how far in advance you can book and whether there's a current wait.
What documents to bring to your appointment
The building department will have sent you a checklist when you called or when you downloaded the application. Standard requirements usually include a completed permit application form (signed and dated), a site plan or plot plan showing your property and the work location, and proof that you own the property or have the owner's written permission. For most residential work, you'll also need a detailed plan of what you're building or changing — this might be a simple sketch for a deck, or full architectural drawings for an addition.
Bring originals or certified copies, not photocopies, unless the department specifically says copies are acceptable. Bring more copies than you think you'll need — the examiner typically keeps one set and may ask you to leave extras for the plan review team. If you're hiring a contractor, some departments require a signed contract or letter of authorization from you; others don't. Ask when you schedule whether the contractor can attend in your place or whether you must be present.
What happens during the appointment
The permit examiner will review your application and plans for completeness and obvious code violations. They're checking that you've filled out the form correctly, that your site plan shows the property lines and the work location, and that your construction plan is detailed enough for the plan review team to understand what you're building. If something is missing or unclear, they'll tell you what needs to be added or corrected before they can accept the application.
If everything is complete, they'll accept your application, give you a receipt or reference number, and tell you the expected timeline for plan review. This is not a permit — it's proof that you've submitted. The actual permit comes later, after the plan review team has checked your work against building codes. Ask during the appointment how you'll be notified when the permit is ready and whether you can pick it up or if it will be mailed.
Scheduling delays and what to do if appointments are full
During busy seasons — spring and early summer in most places — building departments often book appointments weeks ahead. If the first available slot is too far away, ask whether you can submit by mail or online instead. Many departments accept mailed applications without an appointment, though processing may take longer because the examiner has to contact you by phone if something is unclear or missing.
If you're on a tight timeline, ask the department whether they have a rush or expedited review option. Some charge a fee for faster processing; others prioritize certain project types. Be honest about your deadline — if you need the permit by a specific date, the department can tell you whether that's realistic given current wait times. If it's not, you may need to adjust your project start date or explore whether a different permit type or approach would move faster.
After your appointment: tracking your permit
After you submit, the department will give you a case number or reference number. Write it down and use it for all future contact. Most departments have an online portal where you can check the status of your permit — search "[your city] permit status" or look for a link on the building department website. If there's no online system, call the department and reference your case number to ask where your application is in the review process.
Plan review typically takes two to eight weeks, depending on the project complexity and the department's current workload. During this time, the plan review team may find issues that require you to revise your plans and resubmit. If that happens, you usually don't need another appointment — you can submit revisions by mail or through the online portal. Once the plans are approved, the department will issue your permit, and you can pick it up or have it mailed to you.
Frequently Asked Questions
Can I submit my permit application without an appointment?
Many departments accept mail or online submissions without an appointment, though some require an in-person appointment for certain project types. Call your building department to ask whether your specific project can be submitted by mail or online, and whether doing so will delay your timeline.
What if I miss my appointment?
Call the building department as soon as you realize you'll miss it and ask to reschedule. Most departments will rebook you without penalty if you call before your appointment time. If you miss without calling, you may lose your slot and have to wait for the next available opening.
Do I have to attend the appointment myself, or can my contractor go?
This varies by department. Some require the property owner to be present; others allow a contractor or authorized representative. Ask when you schedule whether the contractor can attend alone, or whether you need to be there.
How long does it take to get a permit after my appointment?
The appointment is just submission. After that, plan review typically takes two to eight weeks depending on project complexity and the department's workload. The department will contact you if they need revisions or have questions.
What if the building department says my plans are incomplete?
The examiner will tell you specifically what's missing or needs to be changed. You can usually submit revisions by mail or online without scheduling another appointment. Ask whether you need to pay an additional fee or whether the original submission fee covers revisions.